beautypg.com

Changing double sprocket, Changing jackshaft sprocket, Needed, skip to step 12 – Great Plains 2SNG30 Material Rate User Manual

Page 5

background image

Great Plains Manufacturing, Inc.

Main Seed Box Planting

3

12/01/2010

202-578B

Changing Double Sprocket
Set this identically on the gauge wheel of each wing.

Refer to Figure 2
4.

Loosen idlers

and

, and remove both chains

from double sprocket

.

5.

Remove retaining pin

from shaft.

6.

Remove sprocket

from shaft, and reverse orienta-

tion of which disk is in/out.

7.

Replace sprocket

on shaft and re-pin

.

8.

Place chains back on sprockets.

9.

Re-engage idlers and tighten, leaving

3

4

in slack in

forward span of chain

.

10. If jackshaft sprocket does not need to be changed,

skip to step 17.

Changing Jackshaft Sprocket
Set this identically on the gauge wheel of each wing. it
may be necessary to shorten or lengthen the upper
chain. It has removable links for this purpose.

Refer to Figure 3
When re-assembling a chain, make sure the open end of
the clip faces away from the direction of chain travel, to
reduce chain fouling from debris caught in the clip.

Refer to Figure 4
11. If the double sprocket did not need to be changed,

loosen upper idler (

in Figure 2).

12. Remove chain from jackshaft sprocket

.

13. Loosen set screws

on both upper sprockets (only

one of two shown in figure).

14. Slide current sprocket aside. Position it so that it

does not rub on any fixed machine parts. Re-tighten
the set screw.

15. Slide new sprocket into approximate position.

16. Re-mount chain, and align sprocket

so that chain

is perpendicular to the jackshaft (parallel to the
ground drive frame). Tighten set screw

.

17. Re-engage idler

and tighten it until there is

1

2

in

slack in the forward span.

1

Figure 2

Double Sprocket

16409

4

5

3

6

3

4

1

5

1

1

5

6

Figure 3

Chain Link and Clip

26482

Figure 4

Jackshaft Sprockets

16412

2

8

7

3

2

7

2

7

3

This manual is related to the following products: