beautypg.com

Installation instructions, Step 1, Step 2 – Quoizel MY6325ML Monterey Mosaic User Manual

Page 2: Step 3

background image

INSTALLATION INSTRUCTIONS

STYLE NUMBER MY6325ML

:

STEP 1

:

a Place the Base onto a flat working surface.
b. Screw the Hex Nut end of the Nipple into the Hex Coupling on

the top center of the Base. Using pliers, thread the Hex Nut
against the Hex Coupling and hand tighten until snug.

c. Pass the following components over the top end of the Nipple

in turn:

Spacer Tube, Check Ring, Shade holder, Shade, Plastic

Washer and Flat Washer.

Secure them by threading the Hex Nut onto the top end of the

Nipple. Tighten gently until snug.

.

STEP 2

:

a Pass the Cap over the top end of the Nipple and secure with

the Finial. Hand tighten until snug.

.

STEP 3

:

a Install correct Bulbs referring to fixture markings and/or labels for maximum wattage.

Your installation is completed now. Restore electricity. Keep this sheet for future reference.

.

Socket Assembly

Hex Nut

Finial

2 OF 2

Plastic Washer

Flat Washer

Shade

Shade Holder

Spacer Tube

Check Ring

Nipple with
Hex Nut

Hex Coupling

Base

Nipple

Cap