beautypg.com

Installation instructions step 4, Step 5, Step 6 – Quoizel QTR10054IS Quoizel Track Lights User Manual

Page 3

background image

3 OF 3

INSTALLATION INSTRUCTIONS

STEP 4:

a. Place the Shade and the Steel Collar over the Socket

as shown. By using the Socket Collar Tool, thread the
Socket Collar onto the Socket to secure them. Hand-
tighten until snug.

STEP 5:

a.

10

10

Install the Bulb (supplied) into the GU

Base by

aligning the pins on the Bulb with the keyholes in the
GU

Base. Once they are aligned, gently push the

Bulb into the keyholes and twist the Bulb to lock it in
place.

Do not touch the bulb with bare hands

use a cloth or glove.

IMPORTANT:

STEP 6:

a. Carefully hold the Shade and the Shade Holder adjust

them to your desired directions.

,

Socket

Socket Collar

Shade

Your installation is completed now. Restore electricity. Retain this sheet for future reference.

Swivel

Shade

STYLE NUMBER: QTR10054IS, QTR10054PN

Steel Collar

Socket

MR16 Bulb
(supplied)

Socket Collar Tool