Quoizel UPCN5003WT Uptown Carnegie User Manual
Page 3

Figure 1
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2013 QuoizelInc.
3of7
STEP 1
Assemble Center Stem to Socket
Assembly
-
A. Thread Stem 4.5”L (N) onto Socket Assembly (O). Hand
tighten until sung.
Socket
Assembly
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,
.
.
.
Assembly Instruction Sheet #IS-UPCN5003WT
For Style UPCN5003WT
September2013
Stem 4.5”L
Figure 2
STEP 2
Assemble Rods
-
B. Determine the Rods (J/K) to be assembled to the fixture
according to your hanging height.
C. Pass Supply Wires and Ground Wire through the chosen
Rods (J/K) and then thread the chosen Rods (J/K) and the
Socket Assembly (N) together. Hand tighten until snug.
A. Place the Lathing Part (M) onto the
(N).
Stem 6” with Long
Nipple
12” Rod
6” Rod
6” Rod
12” Rod
Stem
Supply Wire and
Ground Wire
STEP 3
Assemble
to Upper Rod
-
Fixture Loop
A. Pass Supply Wires and Ground Wire through the Fixture
Loop (I) then thread the Fixture Loop (I) and the Upper
Rod together. Hand tighten until snug.
Fixture Loop
Upper Rod
Supply Wire and
Ground Wire
Figure 3
Lathing Part