beautypg.com

Quoizel TFCS2820VB Chastain User Manual

Page 2

background image

2of3

Figure 4

AA

BB

CC

DD

CC

BB

EE

FF

II

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700

or visit us on-line at www.quoizel.com

2013 QuoizelInc.

December2013

STEP 3

Install Crossbar

-

A.

AA)

Attach the Crossbar (

to the Outlet Box with the head of the

Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included)

Tighten until snug

.

.

Figure 3

Outlet Box

Outlet Box Screw
(not included)

Green Ground Screw

AA

STEP 4

Install Canopy Chain Loop and Nipple

-

* Pliers is required for this step.

A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at

least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.

B. Thread another Hex Nut (CC) to the middle of the Nipple (DD).

Place another Lock Washer (BB) over the Nipple (DD) and then
thread the Nipple (DD) into the Crossbar (AA) until the Nipple (DD)
is about 0.375” above the Crossbar (AA).

C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop

(EE). Place the Ceiling Canopy (II) over the Canopy Chain Loop
(EE) against the ceiling to determine the correct position of the
Nipple (DD). Thread the Canopy Lock Ring onto the Canopy Chain
Loop (EE). Adjust the Nipple (DD) to allow the Ceiling Canopy (II) to
rest against the ceiling when held in place by the Canopy Lock Ring
(FF).

D. Remove the Canopy Lock Ring (FF) and the Ceiling Canopy (II).

Tighten the Hex Nut (CC) against the Crossbar (AA) to secure in
place.

STEP 5 - Install Fixture Chain and Ceiling Canopy

A. Adjust the Fixture Chain (GG) to your desired length by removing

the links if needed.

Pliers is required for this step.

B. With the Fixture Chain (GG) not attached to the Fixture Loop (A)

and the Canopy Chain Loop (EE), pull the supply wires through the
Fixture Chain (GG) alternating links. After the wires are through the
Fixture Chain (GG), pull the Supply Wires and the Ground Wire
through the Canopy Lock Ring (FF) and the Ceiling Canopy (II) in
order.

C. Attach one end of the Fixture Chain (GG) to the Fixture Loop (A)

with one Quick Link (HH). Lift the fixture and Fixture Chain (GG) up
And Attach the other end of the Fixture Chain (GG) onto the Canopy
Chain Loop (EE) with another Quick Link (HH). The fixture will now

*

Figure 6

DD

A

GG

II

Supply Wires

and Ground Wire

STEP 6 - Wire Connections

A. Use standard wire connectors (not included) to make all wire

connections. (Connectors are not included with fixture.) Strip and
prepare wire ends according to instructions supplied with
connectors.

B. Connect White Supply Wire from the Outlet Box to Ribbed side

Wire from fixture.

C. Connect Black (or Red) Supply Wire from the Outlet Box to Smooth

side Wire from fixture.

D. Connect Ground Wire from the Outlet Box to Ground Wire from

fixture.

E. Twist connectors until wires are tightly joined together.
F. Wrap each connection with approved electrical tape and carefully

stuff all the connected wires into the Outlet Box.

White wire

from supply

Ribbed side wire
from fixture

Black wire from
supply (or Red)

Smooth side wire
from fixture

Ground wire

from supply

Ground wire
from fixture

Figure 6

hang safely. Close the chain loop at the Ceiling Canopy Loop (EE).
D. Feed the Supply Wires and Ground Wire through the Canopy Chain

Loop (EE) and Nipple (DD) into the Outlet Box. Cut the wires leaving
approximately 8” of wire extending from the Outlet Box.

E. Refer to Step 6 for wire connections.
F. Raise the Ceiling Canopy (II) and Canopy Lock Ring (FF) up the

Fixture Chain (GG) and over the Canopy Chain Loop (EE). Tighten
the Canopy Lock Ring (FF) onto the Canopy Chain Loop (EE) until
tight.

Suggested chain length for Ceiling height :
8’ ceiling : use 1 link of chain and 2 quick links
9’ ceiling : use 11 links of chain and 2 quick links
10’ ceiling : use 21 links of chain and 2 quick links

Step A

Step B

EE

FF

HH

HH