Preparation, Installation instructions, Step 1 – Quoizel BRB2822K Bradbury User Manual
Page 2: Step 2

2 OF 4
PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package contents
list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the
product. Contact customer service for replacement part.
● Estimated Assembly Time: 20 - 30 minutes
● Tool Required for Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape,
Wire cutter, Safety glasses and (4) 100W A19 medium base bulbs
● Helpful Tools (not included): Wire strippers.
.
STYLE NUMBER: BRB2822K
INSTALLATION INSTRUCTIONS
6” Rod
12” Rod
12” Rod
6” Rod
Shade with
Sockets
Supply Wires with
Ground Wire
STEP 1:
a. Determine the Rods to be assembled according to your
desired hanging height.
b. Pass the Supply Wires with Ground Wire through the
chosen Rods and then thread Rods and Shade with
Sockets together as shown. Hand-tighten until snug.
STEP 2:
a. Pass the Supply Wires with Ground Wire through the
Swivel and Ceiling Canopy.
b. Thread the Swivel onto the top end of the Upper Rod.
Hand-tighten until snug.
Coupling
Swivel
Ceiling Canopy
Supply Wire with
Ground Wire
Upper Rod