beautypg.com

7 testing the nbr, Testing the nbr -11 – Cabletron Systems NBR-420 User Manual

Page 28

background image

Preparing the NBR for Installation

NBR-SERIES Installation Guide

Page 3-11

3.2.7 Testing the NBR

Before installing the NBR in a live network, test the hub in a controlled
situation to ensure that it is bridging packets. Perform this test with two
workstations (see Figure 3-6), as follows:

1. Connect the first workstation to an NBR EPIM or BRIM.

2. Connect the second workstation to an NBR EPIM or BRIM.

3. Assign a valid IP address to the NBR using Local Management.

4. Designate the first workstation as a file server and the second one as

the client. Refer to the workstation manuals for establishing one as a
file server and one as a client.

5. Send packets between the two workstations to verify the proper

operation of the NBR.

If a failure occurs, see Chapter 4 for troubleshooting instructions.

NOTE

A “ping” test of the other workstation verifies the NBR is
operating properly.

This manual is related to the following products: