Tundra IBC15 User Manual
Page 6

6
IBC15-GD-0512-EN
12 Volts Installation using Tundra CM15-12 installation kit.
1- If DC cabling must be routed through a sheet metal wall or floor, always use the included strain relief. With a hole
saw, simply drill a hole, install the strain relief, run the cable through it.
2- By using the « charger » side of the wiring harness (BLACK = NEGATIVE, WHITE = POSITIVE) insert stripped
wire sections into receptacles and tighten screws firmly.
3- Install the included split loom onto the "interior" harness.
4- Secure the wiring harness as close as possible to the charger by using one of the included steel clamp. This
procedure will help maintain solid connections even in vibrating environments.
5- Tighten the strain relief nut firmly.
6- Install the included split loom onto the “exterior side” of the harness.