PAGE 8

Q-SERIES DI HEATER OPERATION / MAINTENANCE MANUAL

5. Apply the locking energy isolation device (lock) through the hole in the

actuating handle and secure the lock.

6. Verify that the tool has been isolated and de-energized by attempting

to turn the main power disconnect back to the “ON” position and/or by
pressing the machine start button. The machine power must not be
reapplied and/or the machine must not start.

2.3.d Machine Start-Up with access panels installed

Perform the following sequence of events in the order listed for electrical
re-energization of the tool:

1. Ensure that all hand tools are removed from the equipment and that it

is ready for start-up.

2. Notify personnel in the area that you are going to start-up the

equipment.

3. Open the lock and remove the locking energy isolation device (lock)

from the hole in the actuating handle of the Main Disconnect Switch.

4. Move the actuating handle to the "ON" (up) position.

5. Press the machine start button. The machine should start.

2.3.e

Machine

Lockout with access panels removed

Perform the following sequence of events in the order listed for electrical
energy isolation of the tool:

1. Notify personnel in the area that you are going to shut down the

equipment.

2. Shutdown the system in an orderly fashion.

3. Locate the main incoming power disconnect switch-actuating handle.

4.

Rotate the rotary disconnect shaft to the "OFF" of “0” (down) position.

5. Insert key and lock the rotary disconnect lock located at the top left of

rotary disconnect device (see Figure 2-2). Remove the key.

6. Verify that the Tool has been isolated and de-energized by attempting

to turn the rotary disconnect shaft back to the “ON” or “1” position
and/or by pressing the machine start button. The machine power
must not be reapplied and/or the Machine must not start.

2.3.f Machine Start-Up with access panels removed

Perform the following sequence of events in the order listed for electrical
re-energization of the tool:

1. Ensure that all hand tools are removed from the equipment and that it

is ready for start-up.

2. Notify personnel in the area that you are going to start-up the

equipment.