5 parts list, 6 clean-up, 7 disassembly – Trebor 50U Maxim User Manual
Page 16

PAGE 16
MAXIM 50E/U PUMP OPERATION / MAINTENANCE MANUAL
4.5 PARTS LIST
ILL
NO
PART NO
QTY
DESCRIPTION
PM
YEAR #
MATERIAL
1
AK003-01
2
Union Nut
PVDF
(PP optional)
2
DP-C-12
2
End-of-Stroke Probe (E Model only)
PTFE, Kynar,
Acrylic, PE
3
W0154
2
Probe Seal (included in DP-C-12)
(E Model only)
PTFE
4
AK124
2
Head
PP
5
1700C0047
4
Diaphragm
2
PTFE
6
W0151
2
Fiber Optic Target
2
PTFE
7
1700B0041
2
Push Plate
PTFE
8
AK004
1
Shaft
2
PFA
9
98003079
2
Shaft Seal
2
PTFE
10
AK065
1
Body
PTFE
11
AM084
1
Surge Port Seal
PTFE
12
AM075
1
Damper Plug
PTFE
13
AK026
2
Discharge Cage Check
PTFE
14
AK068
2
Suction Check
PTFE
15
98001415
4
Check Ball
2
PTFE
16
98002334
4
O-Ring
2
PTFE
17
AK066
2
Suction Seat
PTFE
18
AK153
2
Check Port Seal
2
PTFE
19
AK149
2
Suction Plug
PTFE
20
98003047
2
Quick Exhaust Seal
1 & 2
Viton
21
1900B0016
2
Quick Exhaust Port
1 & 2
UHMW
22
AK205
2
Muffler Assembly
1 & 2
PP
23
1900B0072
2
Exhaust Plug
(Optional for remote exhaust)
PP
24
98003277
4
Transfer Tube Nut
PP
25
AK182
4
Transfer Tube
PFA
26
AM037
2
Leak Port Seal
PTFE
27
AM035
2
Leak Port Plug
PTFE
28
AK088
1
Mounting Base
PP
29
98003071
1
Screw, PP
PP
30
AK108
1
Locking Lever
PP
31
98003080
2
1/4 NPT Fitting
PP
32
AK075
1
Control Base
PP
4.6 CLEAN-UP
To help remove potentially dangerous chemicals prior to service or shipment, the
pump should be flushed with DI water or disassembled and thoroughly cleaned.
Allow DI water to flush through the inlet and out the outlet to prevent pressure
build up.
CAUTION: When handling pump wear appropriate personal protection
gear, including safety glasses.
4.7 DISASSEMBLY
During the life of the pump it will be necessary to perform certain preventative
maintenance procedures to ensure its continued high performance. This section
and the next (4.8
Assembly) are provided for the user’s convenience in
disassembly and re-assembly procedures.