Trebor 50D Maxim User Manual
Page 20

PAGE 20
MAXIM 50D PUMP OPERATION / MAINTENANCE MANUAL
Install discharge check cage into bore making sure small end fits into relief in
bottom of bore.
Drop ball into check cage, then O-ring.
Install suction sleeve into the bore; tighten using 1” pin tool. Tighten until
engagement with O-ring is achieved, then unthread the sleeve a quarter turn.
Do not over tighten as damage may occur.
Install second ball into check cage, then O-ring.
Install suction seat using the 1” pin tool. Tighten until engagement with O-ring
is achieved, then unthread the seat a quarter turn.
Install check seal onto check bore shoulder and thread suction plug into bore
using 1” pin tool, torque to 60in-lbs.
Repeat for the second bore.
Install two shaft seals in shaft bore groove with slits 180
apart.
Thread push plate onto main shaft until engagement with the shaft shoulder
is achieved. Additionally apply a ¼” turn to ensure proper installation.
Thread shaft onto shaft insert tool and insert shaft into bore.
Figure 4-5
Remove shaft insert tool and thread second push plate until engagement with
the shaft shoulder is achieved. Additionally apply a ¼” turn to ensure proper
installation.
4.8.c Final Assembly
Reattach pump to assembly fixture.
Attach union nut to one side of pump body (hand tight). Do not install
diaphragm on this step. This will protect body during initial pump assembly.
Remove pump from the assembly fixture.
Place pump body with union nut down and place two diaphragms, removing
all air from b
etween diaphragms, with “V” groove point toward the body.
NOTE: Make sure wear disk is on diaphragm surface closest to head.
Install head on body. Note tab alignment and orientation of transfer tube
ports in head.