3 assembly, 7 sectional drawing, 1 legend – Richter MNK Series User Manual
Page 8: Assembly, Legend, Series mnk, mnk-b, External flushing
Series MNK, MNK-B,
external flushing
Page 8
9230-060-en
Revision 02
TM 6778
Edition 05/2007
6.3 Assembly
Insert O-ring 412/2 using a feeler gauge (0.3 mm).
Screw on support 732 loosely at first.
Screw lock nut 920/07 onto transition pipe 721/1.
Screw transition pipe into the support until it is
centered.
Secure support finally. Tightening torque 10 Nm.
Screw in transition pipe until the plastic lining is
firmly positioned, i.e. can no longer be turned.
Then screw in the transition pipe further until its
flange bores are at 45° to the axis.
Secure transition pipe with lock nut. Tightening
torque 50 Nm.
Check with a gauge (approx. 2 mm Ø) whether
there is a free passage into the plain bearing ped-
estal.
Further assembly in accordance with the drawing in
Section 7.1.
7
Sectional drawing
7.1 Legend
339
plain bearing pedestal
412/2
o-ring
557/3
contact disc
720/1
elbow
721/1
transition pipe
732/x
support
901/8
hex. screw
914/2
hex. socket screw
920/x
hex. nut
934/3
lock washer
Pump size
X
1
X
2
Y
1
Y
2
Z
1
25-25-125
178
--
112
--
45
25-25-160
--
280
--
262
40
50-32-125
178
--
112
--
45
50-32-160
--
280
-
262
40
50-32-200
213
--
160
--
50
65-40-200
213
--
160
--
50
80-50-160
--
280
--
262
40
80-50-200
213
--
160
--
50
80-50-250
256
--
180
--
62
125-80-200
256
--
180
--
63
125-100-200
256
--
200
--
63
Dimensions in mm