Drawing 2 drawing 1 – RCBS ProMelt Electric Lead Furnace User Manual
Page 4

TO USE:
●
Set the thermostat at its lowest temperature and turn on the Pro-Melt. The pilot light located in the on-off switch
will indicate when there is power to the element.
●
After the Pro-Melt has been on for approximately 15 minutes (the pilot light will go on and off), set the thermostat
at 650
°
F.
●
Add small pieces of scrap lead or ingots to the melting pot, stacking them against the sides as much as possible.
●
Continue adding small pieces of lead or ingots until you have approximately 1" to 1
1
/
2
" of molten lead in the
melting pot. After you have 1" to 1
1
/
2
" of molten lead in the melting pot, more lead may be added in any amount.
Do not operate the Pro-Melt with less than 1" of alloy in it.
●
The flow of alloy can be increased or decreased by raising or lowering the socket head cap screw. Usually
1
/
32
" to
1
/
16
" of handle travel will give an adequate flow.
●
For bullet casting instructions, consult the instruction book you received with your bullet moulds.
●
When melting metals to produce an alloy, always be certain that you are using the recommended metals and
recommended amounts.
Drawing 2
Drawing 1