Service of power components, Post flight checklist, Disassembly – E-flite Adagio 280 BNF Basic User Manual
Page 11: Assembly tips
11
EN
Service of Power Components
B
Disassembly
CAUTION: Always disconnect the battery
before handling or adjusting the propeller
or motor. Failure to do so could result in
personal
injury.
Propeller
1. Remove the 2 screws (A) from the spinner (B).
Carefully separate the spinner from the back
plate.
2. Remove 2 bolts (C), 2 nuts (D) and 2 propeller
blades (E) from the back plate.
3. Remove the lock nut (F) from the propeller
shaft, then remove the back plate (G).
4. Loosen the 2 setscrews (H) and remove the
propeller shaft (I) from the motor.
Motor and Firewall
1. Remove the 4 screws (J) and motor mount (K)
from the fuselage.
2. Disconnect the motor wires from the ESC.
3. Loosen the 2 setscrews (L) and remove the
motor (M) from the motor mount.
Assemble in reverse order.
Assembly Tips
• Correctly align and connect the motor wire
colors with the ESC wires.
• Ensure the propeller blades swing freely in the
spinner back plate.
• Tools are required to loosen or tighten the
setscrews and the lock nut.
• Ensure the spinner is fully connected to the
spinner back plate for safe operation.
A B
C
E
D
J
K
H
M
Post Flight Checklist
9
1. Disconnect fl ight battery from ESC
(Required for safety and battery life).
2. Power off transmitter.
3. Remove fl ight battery from aircraft.
4. Recharge fl ight battery.
9
5. Store fl ight battery apart from aircraft
and monitor the battery charge.
6. Make note of fl ight conditions and fl ight
plan results, planning for future fl ights.
F
G
I
L