4 setting up the instrument, 1 packaging, 2 checks – Metrohm 850 Professional IC Anion User Manual
Page 22: 3 location, Setting up the instrument, Packaging, Checks, Location
2.4 Setting up the instrument
■■■■■■■■■■■■■■■■■■■■■■
12
■■■■■■■■
850 Professional IC – Anion
3
High pressure pump
See Chapter 2.10.
4
Purge valve
See Chapter 2.10.1.
5
Inline filter
See Chapter 2.11.
6
Pulsation damper
See Chapter 2.12.
7
Injection valve
See Chapter 2.14.
8
Separation column
See Chapter 2.21.
When a guard column (see Chapter 2.20,
page 57) is used, it is installed between
injection valve and separation column.
9
MSM
See Chapter 2.16.
10 Detector
11 Eluent output
Connection to the waste container.
12 Sample input
Connection to the sample vessel (single ves-
sel or sample changer).
13 Sample degasser
See Chapter 2.13. Use optional.
14 Sample output
15 Peristaltic pump
16 Regeneration solution input
Connection to the regeneration solution
bottle.
17 Regeneration solution output
Connection to the waste container.
18 Rinsing solution input
Connection to the rinsing solution bottle.
19 Rinsing solution output
Connection to the waste container.
2.4
Setting up the instrument
2.4.1
Packaging
The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.
2.4.2
Checks
Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.
2.4.3
Location
The instrument has been developed for operation indoors and may not be
used in explosive environments.
Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.