0 sound cover installation instructions – Baumfolder 714XLT: Batch Ctr Manual User Manual
Page 3

PAGE 3
T P 1 0 3 0 2 A
1.0 SOUND COVER INSTALLATION
INSTRUCTIONS
1) Getting Started
Its very important that you follow these instructions
in the sequence noted. Read the instructions carefully
before proceeding with the actual work.
WARNING
Make certain that the 714XLT is unplugged.
Do not plug the power cord into an AC outlet
until the XLT is fully re-assembled, adjusted and
ready to use. Unplug the XLT any time
disassembly is required.
Find a suitable table upon which to set the XLT if not
already mounted to the Baum USA optional carts
(P/N 55849-001 or 279-834-BG-01).
1) Locate and remove the plugs (4) on the back of the
non-operator side guard.(See figure 1, Item 1) These
holes are for mounting the rear sound cover door.
2) Remove the guard from the non-operator side by
removing the four button head screws; using a
an allen wrench.
3) Mount the bottom half of the hinge(Figure 2, Item 1)
to the hinge mounting bracket(Figure 2, Item 2) so that
the plastic side guard is clamped between them.(Figure
2, Item 3)
4) Make certain that the screws do not penetrate into
the opening for the hinge pin.
Set aside panel until re-installation operation.
Figure 1
1
2
3
Figure 2
1
- BAUM15: Pile Folder 1st Station (from 2005 on) (50 pages)
- BAUM15: Pile Folder 1st Station (from 1999 thru 2005) (50 pages)
- BAUM15: Control Panel (12 pages)
- BAUM18: Pile Folder 1st Station (from 2005 on) (50 pages)
- BAUM18: Pile Folder 1st Station (from 1999 thru 2005) (50 pages)
- BAUM20: Pile Folder 1st Station (from mid 2006) - Instruction Manual (68 pages)
- BAUM20: Pile Folder 1st Station (from mid 2006) - Parts Manual (79 pages)
- BAUM20: Pile Folder 1st Station (from mid 2006) - Parts Manual (157 pages)
- BAUM20: Pile Folder 1st Station (from mid 2006) - Parts Manual (81 pages)
- BAUM20: Pile Folder 1st Station (early 2006) (68 pages)
- BAUM20: Pile Folder 1st Station (in 2005) (68 pages)
- BAUM20: Pile Folder 1st Station (from 2002 thru 2004) (68 pages)
- BAUM20: Pile Folder 1st Station (from 1999 thru 2001) (50 pages)
- BAUM20: Pile Folder 2nd Station (from mid 2006) (1 page)
- BAUM20: Pile Folder 16page (from mid 2006) (1 page)
- BAUM20: Continuous Folder 1st Station - Parts Manual (1 page)
- BAUM20: Ifold Service Manual (47 pages)
- BAUM20: Ifold Operation Manual (31 pages)
- BAUM20: Autoset Service Manual for Pile feed (19 pages)
- BAUM20: Sound Cover Installation (5 pages)
- BAUM20: 20 Kicker Assembly Installation (15 pages)
- BAUM20: 1300 series Pump Replacement Manual (11 pages)
- 714XA (49 pages)
- BAUM 26: 8PG Pre-slitter kit (13 pages)
- BAUM 26: Pre-slitter kit (early 2004) (8 pages)
- BAUM 26_30: Folder 1st Station Contfeed (46 pages)
- BaumCut 26.4: side table (5 pages)
- BaumCut 26.4 (For serials 69H1122 thru 76D1132) (98 pages)
- BaumCut 26.4 (For serials 76D1133 thru 78D1000) (104 pages)
- BaumCut 26.4 (For serials 78D1001 thru 78D1100) (104 pages)
- BaumCut 26.4 (For serials 78D1101 thru current) (104 pages)
- BaumCut 31.5 (For serials 76N1101 thru 78N1000) (104 pages)
- BaumCut 31.5 (For serials 78N1001 thru 700N100) (104 pages)
- BaumCut 31.5 (For serials 700N101 thru current) (98 pages)
- D2 Drill (9 pages)
- D3 Drill (from mid 2004 thru 2006) (9 pages)
- D3 Drill (from late 2003 thru mid 2004) (9 pages)
- D3 Drill (up to mid 2003) (9 pages)
- D5 Drill (from mid 2006 thru end 2006) (11 pages)
- D5 Drill (from 2003 thru mid 2006) (11 pages)
- D3HD Dril (11 pages)
- ND5 Drill (from 2000 thru 2002) (11 pages)
- 714XLT: Air-Operations Manual (from 2006) (13 pages)
- 714XLT: Air-Operations Manual (from 2001 thru 2005) (13 pages)
- 714XLT: Parts Manual (134 pages)