Schwank STR-JZ User Manual
Page 42
42
STR-JZ I&O Manual
IM090831
RD: AUG 2009
RL: 09A- BA
TYPE OF GAS:
NG
LP
DOES BUILDING HAVE A NEGATIVE CONDITION:
YES
NO
IF THIS IS A HIGH ALTITUDE AREA WHAT IS THE ALTITUDE ABOVE SEA LEVEL
DOES APPLICATION REQUIRE FRESH AIR TO BURNER
YES
NO
IS HEATER EXPOSED TO CHEMICAL OR CORROSIVE ATMOSPHERE:
YES
NO
ARE ACTUAL MINIMUM CLEARANCES AS PER TABLE 3
YES
NO
CAN HEATER BE AFFECTED BY OVERHEAD CRANES / VIBRATION
YES
NO
ARE GAS SUPPLY LINES ADEQUATELY SIZED FOR SYSTEM
YES
NO
GAS LINES AND BRANCHES HAVE BEEN PURGED OF AIR:
YES
NO
THIS HEATER FIRED WITHOUT ANY MALFUNCTION:
YES
NO
INLET GAS SUPPLY PRESSURE WITH HEATER OPERATING :
WC"
GAS VALVE OUTLET (Manifold) PRESSURE WITH HEATER OPERATING:
WC"
WHAT IS THE LINE VOLTAGE READING AT THE HEATER
VOLTS
WHAT IS THE VOLTAGE READING AT THE IGNITION MODULE
VOLTS
WHAT IS THE FLAME SIGNAL STRENGTH IN uA FROM SENSOR:
uA (microamps)
IS HEATER CONTROLLED BY A THERMOSTAT
YES
NO
IS THE THERMOSTAT STRATEGICALY LOCATED
YES
NO
WHAT IS TOTAL LENGTH OF INSTALLED THERMOSTAT WIRE
FEET
WHAT IS THE GAUGE OF THE THERMOSTAT WIRE
GAUGE
WHAT IS THE HEATER TUBE LENGTH
(10ft per Tube section)
FEET
WHAT IS THE TOTAL LENGTH OF THE VENT (add 10ft for each bend)
FEET
WHAT LENGTH IS COMBUSTION AIR INTAKE (add 10ft for each bend)
FEET
IF REQUIRED....WHAT IS THE LENGTH OF THE TURBULATOR(S)
FEET
IF INSTALLED....IS TURBULATOR AT FLUE END OF SYSTEM
YES
NO
Feet
THIS HEATER MUST BE ELECTRICALLY GOUNDED
FAX COMPLETED REPORT TO TECHNICAL SERVICES: FAX
1-866-361-0523
, VOICE
1-877-446-3727
QUALIFIED INSTALLER TO COMPLETE THIS
TUBE HEATER COMMISSIONING REPORT
“MAXIMUM STACKING HEIGHT” SIGN(S) - POSTED AT THERMOSTAT(S)
Ft