beautypg.com

Operation, Opera t ion – Bush Hog RMB 1445 User Manual

Page 68

background image

OPERATION

RMB 1445 11/10

Operation Section 4-14

© 2010 Alamo Group Inc.

OPERA

T

ION

FRAME ASSEMBLY

Ensure all bolts and screws are in position and
are properly torqued.

Ensure all pins are in place and fastened with
screws.

Ensure frame is properly mounted to tractor and
hardware is properly installed and tightened.
OPS-B- 0021_H

BOOM ARM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of teflon bushings at boom pivot
points.

Ensure each hydraulic cylinder is installed and retained
correctly. Ensure the proper size pins are used to
retain the cylinders in place and are secured properly.

Ensure that all joints are lubricated. See Maintenance
Section for Lubrication Chart. OPS-B-0022_K

Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.

(SG-20)

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of nylon bushings.

OPS-B- 0023_E