Top link attachment -6, Assembly, Assembl y – Bush Hog RMB 1445 User Manual
Page 48: Top link attachment

ASSEMBLY
RMB 1445 11/10
Assembly Section 3-6
© 2010 Alamo Group Inc.
ASSEMBL
Y
TOP LINK ATTACHMENT
1.
Fit the machines top link.(Figure Asm-B-0086)
2.
Raise machine on tractors linkage until the tractor PTO and the machines gearbox stub shaft are approxi-
mately in line. (Figure Asm-B-0087)
NOTE: As lift occurs be aware the machinery may tilt slightly.
The quadrant lever or machine controls must be operated from the tractor seat. During this
operation ensure no one is standing on or between the linkage arm or bars.
3.
Adjust the top link to bring the machines frame vertical. (Figure Asm-B-0088)
4.
Refit the top link nose quadrant pin, fine adjust position using the tractors draft lift.(A) (Figure Asm-B-0089)
5.
Lower tractor linkage control so that machines weight is taken by the yoke.
6.
Fully tighten the stabilizer lower bolts.(C)
- HS1742 (1 page)
- RTNR (20 pages)
- TDR-11 (19 pages)
- RDTH SERIES RDTH 84 (28 pages)
- RMB1865E (67 pages)
- CBH60 (56 pages)
- 1145 (100 pages)
- TOUGH 665H (1 page)
- RTH72-03 (1 page)
- Tough 3545 (33 pages)
- ZERO TURN MOWERS (30 pages)
- 965H (42 pages)
- RFM 60 (20 pages)
- Tough CZ2555 (1 page)
- 300 (62 pages)
- FC-0014 (96 pages)
- 2847 (33 pages)
- Great Bend 284 (1 page)
- 1947 (102 pages)
- TOUGH Subcompact Rear Blades (6 pages)
- TOUGH 1847QT (1 page)
- TOUGH 2346QT (1 page)
- Tough 2846QT (1 page)
- 1747 (30 pages)
- TOUGH RTNR80 (1 page)
- RTS62-04 (1 page)
- 5045 (56 pages)
- RDTH84 (1 page)
- RTN72 (1 page)
- RTC (20 pages)
- TOUGH TD-1700 (1 page)
- EFM 60 (20 pages)
- FTH 600 (20 pages)
- Mid-Mount Loaders 5045 (1 page)
- 2297 (125 pages)
- 2387 (104 pages)
- Tough ATH720 (1 page)
- 3327 (100 pages)
- PT5 (80 pages)
- 2185 (1 page)
- RDTH60 (20 pages)
- 2045 (85 pages)
- Tough SMP73 (2 pages)
- TOUGH CLR60 (1 page)
- TOUGH 2447QT (1 page)