How to operate, 1. preparation for start-up, 2. basic operating procedures – RKI Instruments TAN-5000 Series User Manual
Page 22: 1. preparation, For start-up, 2. basic, Operating procedures

5 How to Operate
5-1. Preparation for start-up
TAN-5000
- 22 -
5
How to Operate
5-1. Preparation for start-up
Before supplying power, read and understand the following precautions. Ignoring these precautions may
cause an electric shock or damage the buzzer unit.
• Connect the buzzer unit to a grounding circuit.
• Check that the wiring is connected to external device properly.
• Check that the power supply voltage is compliant with the specifications.
• Because the external contact may be activated during the adjustment, take measures to prevent an
activated contact from having influences on external circuits.
• Make sure to use a fuse with the specified ratings to prevent fire.
5-2. Basic operating procedures
Power-on
Preparation
for start-up
Initial clear (approximately 25
seconds) *1
Detection mode
Self-latching type: Press the reset switch to stop
the buzzer sound and reset the
alarm contact.
Lock-in type:
If the reading is less than the
alarm setpoint after the buzzer
sound stops, press the reset
switch to reset the alarm
contact.
Press the reset switch.
Press the buzzer stop
switch.
Lock-in type:
Press the buzzer stop switch to
stop the buzzer sound.
*1: Initial clear is activated on the indicator/alarm unit. Initial clear is not
available on TAN-5000.