Start up, Operation, Maintenance/calibration – RKI Instruments GD-70D4S-XX User Manual
Page 10: Parts list

7 • Model GD-70D4S-XX Sample Draw Transmitter
Start Up
1.
Turn on power to the controller.
2.
Turn on the controller.
3.
Turn on power (100 - 240 VAC) to the GD-70D4S-XX.
4.
Turn on the GD-70D. See the GD-70D Operator’s Manual for GD-70D startup
instructions.
Operation
See the GD-70D Operator’s Manual for an operational description of the GD-70D that is
mounted inside the enclosure.
Maintenance/Calibration
See the GD-70D Operator’s Manual for maintenance and calibration instructions. Use the
inlet fitting on the NEMA 4X enclosure to apply gas instead of the fittings inside the
enclosure on the GD-70D.
Parts List
Table 4 lists replacement parts and accessories for the GD-70D4S-XX.
Table 2: Parts List
Part Number
Description
06-1273RK
1/4” O.D. x 1/8” I.D. Teflon PTFE tubing
17-4820RK
Sample fitting, 1/4” tube bulkhead union
18-0107RK
3/4” conduit hub
49-0108RK
Power Supply, 24 VDC
51-0067RK
Strobe light, amber, 24 VDC, NEMA 4X
80-0226RK
Hydrophobic filter with push fittings for 1/4 inch O.D. tubing