Operating the machine, 4 opening and closing of the grinding chamber, 5 mounting the bottom sieve – Retsch SM 300 User Manual
Page 23

Operating the machine
23
5.4 Opening and closing of the grinding chamber
The motor must come to a complete stop before the mill housing can be opened.
Stop the device by pressing the STOP button (G6).
Pull the mini detent pin (E) upwards.
Press the handle on the door catch (F) backwards.
Press the door lock (F1) upwards and open the grinding chamber door.
NOTE
Do not close the grinding chamber door if the feed hopper is folded out to
the side. That would damage the device.
Fig. 11: Opening the grinding chamber door
5.5 Mounting the bottom sieve
•
Select the appropriate bottom sieve.
•
Open the mill housing and slide the bottom sieve (I) of your choice into
the device.
G6
E
F1
F
See also other documents in the category Retsch Equipment:
- BB 50 (41 pages)
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- Cryomill (68 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 200 (32 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RM 200 (36 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 200 tap 30.025.1001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)