Mq sp2 ce saw — inspection - belts & water tank – Multiquip SP2 SCE20H20 User Manual
Page 24

PAGE 24 — MQ SP2 CE SAW — OPERATION & PARTS MANUAL — REV. #6 (09/08/06)
3. Check V-belt tension (Figure 17) by using a tensionmeter
(2.7 - 4.1 kg/6.0 - 9.0 lbs.) against the inside belt at a mid point
between the two pulleys, or by deflecting the center belt at a
mid point 10 mm (3/8”) - 13 mm (1/2”).
Figure 17. V-Belt Tension
MQ SP2 CE SAW — INSPECTION - BELTS & WATER TANK
Water Tank
The SP2 CE Saw is equipped with a removable 19-liter (5-
gallon) on-board water tank fitted in the top of the console which
can be connected to the brass hose fitting on the rear of the
operators console (Figure 18).
Before using the water tank, ensure it is filled to capacity and
connected to the hose fitting to provide lubrication during cutting.
An external water source can also be connected to the SP2 CE
for extended wet cutting operations.
Figure 18. On-board Water Tank Hose Connection
4. DO NOT over or under tension the V-belts. Severe damage
can occur to the saw and engine crank shaft if the belts are
over tensioned. A decrease of power to the blade and poor
performance will result if the belts are under tensioned (loose
on pulleys).
5. If the V-belts becomes worn or loose, replace them by using
the following V-belt part numbers listed in Table 6.
s
y
e
ll
u
P
d
n
a
s
t
l
e
B
-
V
.
6
e
l
b
a
T
e
z
i
S
e
n
i
g
n
E
e
p
y
T
w
a
S
e
z
i
S
e
d
a
l
B
N
/
P
t
l
e
B
-
V
)
.
y
t
Q
(
e
n
i
g
n
E
N
/
P
y
e
ll
u
P
t
f
a
h
S
e
d
a
l
B
N
/
P
y
e
ll
u
P
P
H
3
1
e
n
i
g
n
E
h
s
u
P
m
m
8
0
5
)
h
c
n
i
0
2
(
)
3
(
2
5
0
6
1
1
0
0
-
5
6
6
3
2
3
0
0
-
2
7
1
5
2
l
e
p
o
r
P
-
fl
e
S
3
0
0
-
3
0
7
3
2
3
0
0
-
2
7
1
5
2
P
H
0
2
e
n
i
g
n
E
l
e
p
o
r
P
-
fl
e
S
m
m
8
0
5
)
h
c
n
i
0
2
(
)
4
(
7
9
8
5
1
2
0
0
-
3
3
8
8
2
1
0
0
-
0
8
2
3
2