beautypg.com

Maintenance – Multiquip HTXD6i User Manual

Page 35

background image

hTxd6i RIde-ON TROWeL • OpeRaTION maNuaL —Rev. #0 (03/23/12) — page 35

LONg TeRm sTORage

1. Remove the battery.
2. Drain fuel from fuel tank.
3. Clean exterior with a cloth soaked in clean oil.
4. Store unit covered with plastic sheet in a moisture and

dust-free location out of direct sunlight.

INsTaLLINg paNs ONTO fINIsheR BLades

These round discs, sometimes referred to as "pans", attach

to the spiders arms and allow early floating on wet concrete

and easy movement from wet to dry areas. They are also

very effective in embedding large aggregates and surface

hardeners.
Refer to Figure 29 when installing pans onto finisher blades.

Figure 29. Z-Clip Finisher Pan Installation

1. Lift trowel just enough to slide pan under blades. Lower

finisher onto pan with blades adjacent to Z-Clips.

2. Rotate blades into position under Z-Clips. Ensure that

the blades are rotated in the direction of travel when

the machine is in operation or use the engine to rotate

the blades into position.

cauTION

NeveR store the ride-on trowel with fuel in the tank for

any extended period of time. Always clean up spilled

fuel immediately.

BLADE ASSEMBLY

Z-CLIP, PAN

TIE-DOWN, BLADE

KNOB, TIE-DOWN
Z-CLIP PANS

Maintenance

3. Attach the blade tie-downs to the far side of the Z-Clip

brackets with tie-down knobs as shown in Figure 29.

4. Check to make certain that the blade edges are

secured under the Z-Clips and the tie-downs are

secured completely over the edges of the blade bar

before the machine is put back into operation.