0 control system, Operation, 1 pre-commissioning checks – Multiquip P54K-K2B-K4B User Manual
Page 24

22
P54
K/K2B/K4B
Operation :
5.0 Control System
5.1 Pre-commissioning checks :
Before commissioning every day or prior to an extended work period, carry out the checks listed below.
Danger :
Observe the safety stipulations in Section 3.0 of these operating and maintenance
instructions
• Set the machine down on an even, load-bearing surface.
Check :
• All screw joints for a firm fit
• Function of the travel pedal
• Fuel tank and lines for leaks
• Steering function
• Machine and engine for damage
• Hydraulic system for leaks
Fig. 10
Check hydraulic oil level and top up if necessary
Check soiling of the air filter
Fig. 11
Fig. 13
Fig. 12
Check fuel supply and top up if necessary
Filling opening for diesel fuel
KA
ES
ЦSA
- MT74F (50 pages)
- MT65HA (64 pages)
- MT65H (64 pages)
- MT55F (72 pages)
- MT54F (48 pages)
- MT74FA (50 pages)
- MT84F (50 pages)
- MT84FA (50 pages)
- MTR40F (76 pages)
- MTR40SF (64 pages)
- MTX60 (66 pages)
- MTX60HD (70 pages)
- MTX60HF (66 pages)
- MTX60SD (58 pages)
- MTX70 (68 pages)
- MTX70HD (68 pages)
- MTX70HF (68 pages)
- MTX70SD (58 pages)
- MTX80 (66 pages)
- MTX80SD (58 pages)
- MTX80SF (58 pages)
- MT76D (50 pages)
- MT76D2 (58 pages)
- MT86D_Yanmar (50 pages)
- MT86D_Yanmar (50 pages)
- MT86D2 (58 pages)
- MT60HS (54 pages)
- MT62HS (68 pages)
- MT75HS (50 pages)
- MT85HS (50 pages)
- MTR35HS (54 pages)
- MTR40HS (66 pages)
- MT-60H/H2 (52 pages)
- MT70H (44 pages)
- MT75H (42 pages)
- MT85H (42 pages)
- MTR35W (46 pages)
- MTR60L (44 pages)
- MTR80L (44 pages)
- AR13D (92 pages)
- AR13H (116 pages)
- AR13HA (82 pages)
- AR13HA (116 pages)
- R2000H (90 pages)