beautypg.com

36" bracket / slide installation – Mayline Four Post Shelving User Manual

Page 10

background image

BRACKET ASM.

36" RH

BRACKET
STOP (6)

BRACKET
STOP (6)

1/4-20 X

1
2

" SCREW (8)

BRACKET ASM.

18" / 36" RH

1/4-20 X

1
2

" SCREW (8)

NOTE:
L.H. Brackets have

SQUARE holes.

R.H. Brackets have
ROUND holes

I

NSTALLATION OF BRACKETS FOR ROLLOUT DRAWERS.

For proper spacing and installation of drawers, brackets should be installed

from the bottom up. The location of the bottom drawer and remaining brackets
will be different depending on the height of the drawer being installed. Each

bracket has two tabs on each end of each bracket assembly that get installed
into corresponding open slots on the four post upright.

BOTTOM DRAWER BRACKET INSTALLATION :

10.5" drawer (use 3rd & 4th slots above lower spreader)

6" drawer (use 2nd & 3rd slots above lower spreader)
4.5" drawer (use 1st & 2nd slots above lower spreader)

REMAINING DRAWER BRACKET INSTALLATION:

10.5" drawer (use 3rd & 4th slots above drawer front)

6" drawer (use 2nd & 3rd slots above drawer front)
4.5" drawer (use 1st & 2nd slots above drawer front)

36" Bracket / Slide Installation

FR

ON

T