beautypg.com

Kds model 310 plus series, Loading the syringe, Nv ram failure – KD Scientific 310 User Manual

Page 11: Fuses, Voltage selector

background image

9

KDS Model 310 Plus Series

Loading The Syringe

Raise the spring loaded syringe clamp and rotate away from the syringe barrel.

Using the fast forward/fast reverse feature position the pusher block so that the syringe

plunger and syringe barrel will fit into the syringe holder and pusher block.

Place the syringe barrel in the V of the syringe holder, making sure that the flange of the

syringe barrel is positioned between the two upright posts, and lower the syringe plunger

knob into the pusher block. Rotate and release the syringe clamp to hold the syringe in place.

Pusher Block

Syringe Clamp

NV Ram Failure

If the settings in the non-volatile memory become corrupted the display will read "NV Ram

Failure" and the pump will not operate.

To recover from this condition the pump must be powered down and then turned on again.

The pump will be re-initialized to the default settings and can now be programmed as normal.

A second method of clearing the “NV Ram Failure” is to press select and then enter a

changed rate setting.

FUSES

The fuses are located in the power entry module on the rear panel. The linecord must be first

removed to gain access to the fuse holder.

FUSES

5x20mm, 250V~

slow blow, 0.1A

Voltage Selector

If it is necessary to change the input voltage selection, disconnect the line cord from the entry

module on the rear panel. Use a flat bladed screwdriver to open the Fuse Holder access

door. Remove the Fuse Holder, flip over, and reinstall. Close the access door. The new input

voltage selection should be visible through the door window. Install a proper line cord certi-

fied for the country of use.

Fuse Holder