Cable management – Humanscale M2 Hang Tag User Manual
Page 3

Slide the plastic cover on the 
lower link downward until it 
disengages, then remove.
Route power and monitor 
cables through the cable clips 
on the M2’s upper link.
Cable Management
Route cables inside the 
lower link.
Remove the cable clip on the 
base stem then reattach over 
the cables to secure them 
in place.
Place the plastic cover back 
onto the lower link and slide 
upward until it clicks into place.
