Procedure for replacement of sub-duct collets, Sub-duct clamp collets – General Machine Products 89004 Portable Powered Duct Rod Pusher User Manual
Page 25

Page 25 of 40
General Machine Products Co., Inc.
8. PROCEDURE FOR REPLACEMENT OF SUB-DUCT COLLETS
THE MACHINE IS SUPPLIED WITH COLLETS FITTED FOR 1 1/4” SDR SUB DUCT.
SUB-DUCT CLAMP COLLETS
Tools Required 4mm Allen Key
Step 1 Collet Removal
a. Open the sub-duct clamp.
b. Remove the socket head cap screws (2) – using a 4mm allen key and remove the collet
(2).
Step 2 Collet Refitting
a. Select he replacement collets
b. Clean the sub-duct clamp with a dry cloth.
c.
Fit the required collets and secure with a socket head cap screws – using a 4mm allen
key.
d.
Close the sub-duct clamp.