beautypg.com

Procedure for replacement of sub-duct collets, Sub-duct clamp collets – General Machine Products 89004 Portable Powered Duct Rod Pusher User Manual

Page 25

background image

Page 25 of 40

General Machine Products Co., Inc.

8. PROCEDURE FOR REPLACEMENT OF SUB-DUCT COLLETS

THE MACHINE IS SUPPLIED WITH COLLETS FITTED FOR 1 1/4” SDR SUB DUCT.

SUB-DUCT CLAMP COLLETS

Tools Required 4mm Allen Key

Step 1 Collet Removal
a. Open the sub-duct clamp.
b. Remove the socket head cap screws (2) – using a 4mm allen key and remove the collet

(2).

Step 2 Collet Refitting
a. Select he replacement collets
b. Clean the sub-duct clamp with a dry cloth.

c.

Fit the required collets and secure with a socket head cap screws – using a 4mm allen
key.

d.

Close the sub-duct clamp.