beautypg.com

Indicators, Indicators" on – BenQ Digital Projector MS612ST User Manual

Page 59

background image

Maintenance

59

Indicators

Light

Status & Description

Power events

Orange

Off

Off

Stand-by mode.

Green

Flashing

Off

Off

Powering up.

Green

Off

Off

Normal operation.

Orange

Flashing

Off

Off

• The projector needs 90 seconds to cool down as it was

abnormally shut down without the normal cooling down
process.

• The projector needs to cool for 90 seconds after the power

is turned off.

• The projector has shut down automatically. If you try to re-

start the projector, it will shut down again. Please contact
your dealer for assistance.

Lamp events

Orange

Flashing

Off

Red

The projector has shut down automatically. If you try to re-
start the projector, it will shut down again. Please contact your
dealer for assistance.

Off

Off

Red

1.

The projector needs 90 seconds to cool down. Or

2.

Please contact your dealer for assistance.

Thermal events

Off

Red

Off

The projector has shut down automatically. If you try to re-
start the projector, it will shut down again. Please contact your
dealer for assistance.

Off

Red

Red

Off

Red

Green

Off

Red

Orange

Red

Red

Red

Red

Red

Green

Red

Red

Orange

Green

Red

Red

Green

Red

Green

Green

Red

Orange

Orange

Red

Red

Orange

Red

Green

Orange

Red

Orange

Off

Green

Red

Off

Green

Green

This manual is related to the following products: