2 hauling the tractor and implement, Hauling the tractor and implement -42, Operation – Bush Hog 5145 User Manual
Page 88: Opera t ion
OPERATION
5145 01/11
Operation Section 4-42
© 2011 Alamo Group Inc.
OPERA
T
ION
10.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through. OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer. OPS-U- 0025
- HS1742 (1 page)
- RTNR (20 pages)
- TDR-11 (19 pages)
- RDTH SERIES RDTH 84 (28 pages)
- RMB1865E (67 pages)
- CBH60 (56 pages)
- 1145 (100 pages)
- TOUGH 665H (1 page)
- RTH72-03 (1 page)
- Tough 3545 (33 pages)
- ZERO TURN MOWERS (30 pages)
- 965H (42 pages)
- RFM 60 (20 pages)
- Tough CZ2555 (1 page)
- 300 (62 pages)
- FC-0014 (96 pages)
- 2847 (33 pages)
- Great Bend 284 (1 page)
- 1947 (102 pages)
- TOUGH Subcompact Rear Blades (6 pages)
- TOUGH 1847QT (1 page)
- TOUGH 2346QT (1 page)
- Tough 2846QT (1 page)
- 1747 (30 pages)
- TOUGH RTNR80 (1 page)
- RTS62-04 (1 page)
- 5045 (56 pages)
- RDTH84 (1 page)
- RTN72 (1 page)
- RTC (20 pages)
- TOUGH TD-1700 (1 page)
- EFM 60 (20 pages)
- FTH 600 (20 pages)
- Mid-Mount Loaders 5045 (1 page)
- 2297 (125 pages)
- 2387 (104 pages)
- Tough ATH720 (1 page)
- 3327 (100 pages)
- PT5 (80 pages)
- 2185 (1 page)
- RDTH60 (20 pages)
- 2045 (85 pages)
- Tough SMP73 (2 pages)
- TOUGH CLR60 (1 page)
- TOUGH 2447QT (1 page)