Pump Installation and Wiring Diagram

1. Submersible turbine effluent pumps may be installed in any

application where relatively clear effluent, such as from a dosing

tank or high head STEP system etc., is being pumped.

2. Pumps should always be installed vertically. Pumps should never

be installed horizontally.

3. Because of their low temperature rise, pumps under 2 HP do not

require a flow inducer sleeve.

4. Mount the junction box, if applicable, in its permanent position and

run prewired conduit, or equivalent submersible cable from the junction

box to a fused disconnect or, if applicable, the control panel.

5. Feed the pump power cord and float switch cords into the junction

box, or alternately to the panel if longer cords are used.

6. If a junction box is used, make the connections in the junction

box using the wiring diagrams below. If you are using a control

panel or a filtered STEP system, follow the wiring diagrams and

instructions included with them.

7. An alarm should be used with any system using a pump. Follow

the wiring diagram with the alarm for installation and check your

local codes.

8. Run the appropriate power to the control panel from a fused (circuit

breaker) disconnect. The appropriate power supply information

may be found on the pump nameplate.

9. To provide a suitable ground, a separate ground wire (green

or bare) at least as large as the line conductors is required. It

is connected from the electrical disconnect box to the control

panel, to the junction box and to the green ground wire of the

submersible motor lead.

10. Always disconnect all power when installing or servicing the pump.

SK2221A

SK2221B

SK2250

TO

POWER SUPPLY

TO

FLOAT SWITCHES

GREEN

BLACK

GREEN

WHITE

RED

BLK

YEL

L2

L1

CONTROL PANEL

CLARUS 230 VOLT

TURBINE EFFLUENT PUMP

2HP & 3HP

CAPACITOR BOX

GREEN

115V

FLOAT SWITCH

115 VOLT LINE

GROUND

BLACK

WHITE

BLACK

WHITE

115 VOLT

FUSED DISCONNECT

(CIRCUIT BREAKER)

JUNCTION

BOX

CLARUS 115 VOLT

TURBINE EFFLUENT PUMP

1/2HP

WHITE

BLACK

WHITE

GREEN

WHITE

BLACK

BLACK

BLACK

WHITE

WHITE

WHITE

BLACK

BLACK

BLACK

WHITE

WHITE

BLACK

230 VOLT LINE

GROUND

JUNCTION

BOX

230V

FLOAT SWITCH

GREEN

GREEN

CLARUS 230 VOLT

TURBINE EFFLUENT PUMP

1/2HP - 1 1/2HP

230 VOLT

FUSED DISCONNECT

(CIRCUIT BREAKER)

Splicing Underground Wires

Splicing of wires to be buried must be done according to the National Electrical Code. Wire connectors or splicing

agents installed on conductors for direct burial shall be listed for such use.