Clarus Environmental Centrifugal STEP Vaults User Manual
Installation instructions, Centrifugal step vault stand, Detail 1 detail 2

© Copyright 2012. All rights reserved.
Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies.
Centrifugal STEP Vault Stand
SECTION: C1.60.125
CL0135
0512
Supersedes
New
3649 Cane Run Road . Louisville, KY 40211-1961
877-244-9340 . Fax: 877-414-4316
www.clarusenvironmental.com
®
®
INSTALLATION INSTRUCTIONS
5040 CENTRIFUGAL
STEP STAND
CAST IN
RISER
5040 STEP
VAULT AND
PUMP
BE SURE HOLES
IN 90° ELBOWS ARE
LOCATED ON TOP
DURING ASSEMBLY
LEG EXTENSIONS
ADDED BY THE
INSTALLER
1" X 39" SCH 40
PVC PIPE
(4 REQ'D)
1" X 11" SCH 40
PVC PIPE
(4 REQ'D)
1" 4 WAY TEE
(4 REQ'D)
S.S. SCREWS
(4 REQ'D)
POST SEPTIC TANK APPLICATION
CAST IN RISER APPLICATION
ASSEMBLY VIEW
EXISITING PIPE HANGER
(CUT TO 11” WHEN USED
WITH THE VAULT STAND)
Detail 1
Detail 2
SK2897
Assembling Leg Extensions:
Determine the length needed of 1" SCH 40 PVC pipe for the leg
extensions and glue the appropriate length pipe into the bottom of
the 4-way tee. Install unit as per typical installation. See Detail 2.
Field Assembly of Stand:
Remove existing pipe hangers and cut to
11", then reinstall. Follow the assembly
layout in Detail 1 for completion.