beautypg.com

Coolant circulation, 2 preparing the gel for transfer – C.B.S. Scientific EBU-204 User Manual

Page 8

background image

8

EBU-204 Mini-Blotting System Instructions 6-2-14

SECTION 3

Instructions for Use

3.1 Blotting Unit Preparation

1 Place the blotting chamber on a level work surface in an authorized work area.

2 Consult applications table 4 1 for type of transfer, buffer system, membrane type

and power settings

Coolant Circulation:

For coolant circulation, connect a heavy wall tubing which will not kink (hose clamps

are optional), to the tubing adapters supplied with the unit Excessive pressure will

damage the plexiglass in the base and create leaks Attach a regulated pump or

recirculating water bath (follow manufacturer’s instructions), recommended flow is

500 ml per minute or 15psi

Do NOT use tap or house water as it normally delivers

too much pressure and can be subject to large fluctuations in pressure.

1 Place, do NOT drop, a magnetic spin bar (not supplied by C B S ) in the bottom

of the tank This maintains pH, buffer and heat circulation during the electroblot

2 Place tank on top of the magnetic stirrer

3 Connect to a cold water supply (see coolant circulation above)

4 Buffer should be pre-cooled to 10°C

3.2 Preparing the Gel for Transfer

The EBU-204 can hold up to 4 gel cassettes simultaneously with space provided for

a magnetic stir bar to allow buffer circulation and heat exchange for uniform transfers

When the resolving gel electrophoresis is complete, proceed with staining and photo-

documentation if applicable Cut one corner off the gel so that correct orientation is

maintained throughout the procedure

Preparation of Electroblotting Components

1 CBS membranes are supplied with the blotting paper cut to the correct size for

CleaPAGE gel transfers. If not using CBS membranes, cut transfer membrane to size

of gel or sufficient dimensions to cover the relevant bands. Also, pre-cut Whatman-

type 3MM filter paper to same size and soak in transfer buffer until completely

saturated (15 to 30 minutes)

2 Pre-wet membrane chosen according to manufacturer’s instructions Nylon or Nylon-

supported nitrocellulose should be soaked in ddH

2

O PVDF in MeOH Equilibrate all

types in transfer buffer for 3 minutes Submerge a single foam pad and gently tease to

release trapped air bubbles until pad is completely saturated

3 Pre-equilibrate gel in 1x transfer buffer to be used prior to electroblotting for 5 to 30

minutes depending on gel thickness

4 Open the transfer cassette as shown below in figures 1-2 and lay it flat on the bench.