Bedrug bedliner installation instructions – Bedrug BED LINERS: BedRug User Manual
Page 2

BedRug Bedliner Installation Instructions
Procedure
BRINST Rev. Level: 15 12/4/2009 Page 2 of 6
This document covers such items as:
• Vehicle Preparation (use of cleaners, adhesive promoters, etc.).
• Safety (rechecking torque procedure, etc.).
• BedRug installation.
1. Check Kit Content.
(a) Verify that the kit contains all the parts listed in the
Kit Contents.
2. Vehicle Preparation.
(a) Wash and Dry the Bed and Tailgate areas thoroughly.
(b) IMPORTANT: Review all instructions before
beginning installation. Truck bed should be at least
68°F (20°C) for maximum adhesion. Clean all areas
with an approved cleaner before applying tape. Do not
remove backing from any tape until ready to adhere to
the truck bed. When removing backing, do not touch
adhesive. Extra adhesive strips have been provided in
the kit for future use or if the installer deems more
fasteners are necessary for better fit/appearance.
3. Pre-assemble BedRug.
(a) Align the sides of the BedRug as shown. NOTE:
BEDRUG FLOOR IS FACE DOWN FOR THIS
OPERATION. (Fig 3-1)
(b) Once properly aligned, zip sides into place. (Fig 3-2)
4. Pre-fitting BedRug.
(a) Before preceeding with installation, verify whether or
not the bed of the vehicle has a bedrail cargo
management system installed.
(b) If a bedrail is present, trim off sections in the corners
of the bulkhead. (Fig. 4-2) If not, proceed with step 5.
Fig 4-2
Fig. 3-1
Fig. 3-2
Utility Knife