Unloading procedure and lift package contents – BASELINE Lift BL209BP User Manual
Page 4
![background image](/manuals/555343/4/background.png)
4
UNLOADING PROCEDURE and LIFT PACKAGE CONTENTS
For your information:
All lift components are grouped together in one package held at each end by steel frames.
Unpacking Procedure:
When the lift arrives on site:
If possible have the lift unloaded in the installation area.
Check for freight damage and report immediately to the trucking company who delivered
the lift.
Check for missing parts and report immediately to the factory.
Main Components include:
Power Side Column and Carriage Assembly
– 1 pc (c/w equalizing cable, cylinder
assembly, lifting chain and roller all pre-installed)
Opposite Side Column and Carriage Assembly
– 1 pc (c/w equalizing cable, cylinder
assembly, lifting chain and roller all pre-installed)
Arms
– 4 pc (c/w arm restraint gear assemblies)
Powerpack Assembly
– 1 pc
Cable Cover
Accessory and Hardware Box includes:
Baseplate Shims (6mm - 3mm - 1mm assortment)
Anchor Bolt Assemblies - 10 pc
Arm Pins – 4 pc
Rubber Stack Pad Assembly – 4 pc
Honda Adapters – 2 pc
Stack Pad Adapter (3”) – 4 pc
Stack Pad Adapter (6”) – 4 pc
Hydraulic Hose w/ Fittings – 2 pc (1 long and 1 short)
Steel Floor Plate – 1 pc
Fittings Box (bolts, washers, nuts, screws, cable ties, etc.)
Owner’s Manual