beautypg.com

Installation, Instructions – Autoquip FREIGHTLIFT FLM User Manual

Page 74

background image

74





R. INSTALLATION WRAP-UP

1. After the unit is completely wired, make all necessary and final adjustments to

ensure proper operation of the lift and its safeties as required by the schematic.


2. Refer to the Inspection Checklist located in the Appendix of this Manual, and

confirm the safe and correct condition of each component/feature listed to ensure
that the lift is ready to be given to the User in proper & safe working condition. This
includes, but is not limited to functionality of gate interlocks, gate status switches, lift
level/status limit switches, and slack chain sensing switches.

3. Ensure that the appropriate person signs off on the Warranty Registration Card and

receives one Operation & Service Manual per lift.

4. Install all WARNING SIGNS AND DECALS provided with the unit which may have

been shipped loose for field installation (gate panel, etc.). Refer again to Figure 1.

5. Clean up the area, paint and touch-up as needed.

6. Conduct

Operator

training

before handing off the lift to the customer. Use this

manual as reference for this training & familiarization process.
























INSTALLATION

INSTRUCTIONS