Installation instructions – Autoquip PDQ DOCK LIFT User Manual
Page 15
15
The PDQ is easy to install and operation. It is completely self-contained and ready to
go as soon as the unit is received. The control is centrally located on the platform to
allow operation from either end. All electrical components and wiring are in accordance
with the National Electrical Code. Loads can be quickly rolled over the hinged throw-
over bridge onto the platform. The bridge automatically rises into the up position as the
platform lowers, serving as a wheel chock to help eliminate the danger of shifting loads.
In the lowered position, the platform is 4 _” from the ground. No pit is required and the
unit can be used to service several locations. The portability wheels are large enough
to facilitate ease of movement and to minimize damage to surfaces. The PDQ may be
used inside or outside. It requires no lagging and is completely weatherproof.
1. Wire the heavy-duty power cord onto a plug suitable for three-phase duty.
2. Check to ensure there is proper pump rotation.
INSTALLATION INSTRUCTIONS