INSTALLATION INSTRUCTIONS
8. Verify operation of the upper level gate.
NOTE:
The cam must rotate the actuator arm in the upward direction at the upper
level and rotate down on the lower level.
9. When the cam location has been verified, weld it to the carriage.
NOTE: With the G.A.L. interlock, it may be necessary to extend the roller arm out to the
strike. It may not be possible to extend the strike out because of floor clearance.
The only option is to extend the roller mount out to meet the strike. This can be
done with a piece of ½” x 1” bar cut and drilled for the length needed.
NOTE: The lift MUST NOT operate unless the gate(s) are closed and the MUST NOT
operate unless the lift is at the same floor level as the gate which is to be opened.
WARNING
!
Never run the unit with the gates or doors open! The gates must
not open when the lift is in operation or when the platform is not
present. Should this condition exist, the interlock is not
functioning properly due to incorrect installation or damage.
This condition must be corrected immediately. Failure to correct
this condition may result in serious injury or death.
G.A.L. SM WIRING INFORMATION
• The contact clock is wired in series between the terminals specified on the
electrical schematic.
DANGER
!
Qualified personnel only!! Only qualified service personnel
should perform procedures labeled as “dangerous”!