Installation instructions – Autoquip GATES SWING User Manual
Page 18
INSTALLATION INSTRUCTIONS
BI-PART SWING GATE INSTALLATION
Installation for a bi-part gate is the same as a single swing. The only difference is there
will be two gate panels. Follow the same instructions a for a single swing gate.
Remove the shipping strap that is welded across the front of the gate after the gate is
erected and braced. The strap can be removed by using a wrench to break the weld off
by bending the angle up. Grind the weld smooth and then touch up the area that is not
painted.
RAMP OPTION
1. When a ramp is used, the gate will have additional space from the bottom of the
gate panel to the floor in order for the ramp to clear.
2. Position the front edge (highest edge) of the ramp 1” from the edge of the lift
platform.
3. Secure the ramp in position using concrete anchor bolts (expansion) at each
mounting tab. The installer supplies these bolts.
Figure 7 – Ramp Clearance
18