Connecting the check valve to the pump step 9, Fill pond step 10 – Aquascape PRO-Fit Classic Skimmer (29894) User Manual
Page 7
7
Aq
ua
Cl
ea
r
Connecting the Check Valve to the Pump
STEP 9
• If you have helpers, while the
waterfall is being constructed,
one person could be working on
the installation of the pump,
check valve, filter mats, and
overflow.
(fig. 19 and fig. 0)
Important: Bring the pipe through the
back of the skimmer before attaching
the fittings.
• Remove the threaded collar and
slip the pipe adapter from the
check valve.
Make sure that you
put the threaded collar on the
pipe before you glue the fitting
on the pipe.
• Slide the threaded collar onto
the flexible PVC pipe.
• Using the flexible PVC primer
and glue, attach the slip pipe
adapter to the flexible PVC pipe,
and thread the check valve into
the pump discharge and place
the pump into the skimmer box.
Overflow:
Attach bulkhead & pipe adapter. Set desired pond level from this point using a
transit, a water level tool, or a string level. Drain water at least a few feet away from
skimmer using a piece of 2 in. Flex PVC piping.
Fig. 19
Pond Overflow
The overflow
pipe must be
sloping away
from the
skimmer to
prevent water from going into the
skimmer during heavy rains.
Fig. 0
Check valve assembly.
.
Slide collar piece over PVC, then
glue pipe end cap to PVC tubing.
3.
Slide collar up to check valve and
hand tighten. It’s as simple as that!
Collar
Piece
End
Cap
1.
Feed flex PVC pipe through
back of skimmer first.
WFV
Pipe
Discharge
Opening
Over Flow
Opening
Pump
Electrical
Cord Slot
Skimmer Vault:
Rear View
Fill up the pond with water. The
pond should be filled just below the
level of the overflow in the skimmer.
Fill Pond
STEP 10