Echo CH9540H Instruction v.3 User Manual
Page 2
Instruction Sheet
DRILL hOLE IN ChANNEL BRACkET
1. You must drill a hole in the Chipper Bottom Weldment
(in the Channel Bracket) to be able to attach the
Brace PTO 3-Point Weldment. Follow the
measurements below:
The hole must be drilled 12.22" from the outside edge
and 0.75" in from the edge of the bracket to the middle
of the hole. The hole must be 0.66" diameter.
12.22"
Ø0.66
.75"
DRILL hOLE BRACE WELDMENT
1. You must drill a hole to allow the Brace PTO 3-Point
Weldment to be bolted to the Chipper Bottom
Weldment.
The hole must be drilled 4.12" from the top of the
weldment and 2.38" in from the edge of the weldment
to the middle of the hole. The hole must be 0.69"
diameter.
Ø0.69
4.12"
2.38"
FROM EDGE TO CENTER OF HOLE
Ø0.69
4.12"
2.38"
FROM EDGE TO CENTER OF HOLE