Assembly, Install blower pipes / stick handle, Assembly pb-265ln – Echo PB-265LN User Manual
Page 12
12
X7501183702
© 03/2013 ECHO Inc.
ASSEMBLY
PB-265LN
ASSEMBLY
Never perform maintenance or assembly procedures with engine running or serious personal injury
may result.
Install Blower Pipes / Stick Handle
1. Assemble clamps (A) onto both ends of flexible pipe (B)
2. Assemble swivel pipe (C) into flexible pipe (B) and tighten
clamp (A).
3. Assemble flexible pipe (B) to elbow (D) on blower and
tighten clamp (A).
Note: A light lubricant may be used to ease assembly of flexible
pipe to blower elbow.
4. Loosen wing nut (E) completely and open stick handle
clamp.
5. Align notches (F) in handle clamp with tabs (G).
6. Slide stick handle onto swivel pipe (C). Stick handle should
be angled away from operator.
7. Position stick handle (H) for comfortable operation, and
tighten wing nut (E).
8. Assemble straight pipe (I) onto swivel pipe (C), until you feel
light resistance. Do not force connection. Hold swivel pipe
and turn straight pipe counter clockwise, engaging positive
locking channels,until connection is firm. Do not force
connention.
9. Assemble straight pipe with decal (J) to straight pipe (I) as in
step 8.
Note: Blower use will eventually loosen pipe connections.
Exclusive positive locking system allows pipes to be
tightened. If loosening occurs, remove lower straight
pipe, and install according to instructions 8 & 9.
D
A
B
C
H
G
E
F
H
C
I
J