11 shut down and park, 12 tie down and lifting – JLG 460SJ Operator Manual User Manual
Page 73

SECTION 4 - MACHINE OPERATION
3121216
– JLG Lift –
4-15
4.11
SHUT DOWN AND PARK
1.
Drive machine to a protected area.
2.
Assure main boom is fully retracted and lowered over rear 
(Drive) axle; all access panels and doors closed and secured.
3.
Remove all load and allow engine to operate 3-5 minutes at 
LOW setting to permit reduction of engine internal temper-
atures.
4.
At Ground Controls, turn KEY SELECT switch to (center) OFF. 
Position, POWER/EMERGENCY STOP switch (down) to OFF. 
Remove key.
5.
Cover Platform Control console to protect instruction plac-
ards, warning decals and operating controls from hostile 
environment.
4.12
TIE DOWN AND LIFTING
The weight of the machine is stamped on the serial number 
plate. If the plate is missing or illegible, call JLG Industries or 
weigh the individual unit to find out the Gross Vehicle Weight.
When transporting machine, boom must be in the stowed 
mode and machine securely tied down to truck or trailer deck. 
Four tie down eyes are provided in the frame slab, one at each 
corner of the machine. Lock turntable before traveling long 
distances or before hauling machine on a truck or trailer.
If it becomes necessary to lift the machine using an overhead 
or mobile crane, it is very important that the lifting devices are 
attached only to the designated lifting area. (See Figure 4-6 
Lifting and Tie Down Decal)
NOTE:
Tie down eyes are provided at the front, center, and rear in the 
frame slab. Lifting eyes are located in plate mounted on 
machine front at boom pivot. (See Figure 4-6 Lifting and Tie 
Down Decal)