3 oscillating axle lockout test (if equipped), 3 oscillating axle lockout test, If equipped) -11 – JLG 460SJ Operator Manual User Manual
Page 37

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121216
– JLG Lift –
2-11
2.3
OSCILLATING AXLE LOCKOUT TEST (IF EQUIPPED)
LOCKOUT SYSTEM TEST MUST BE PERFORMED QUARTERLY, ANY TIME A SYSTEM COMPO-
NENT IS REPLACED, OR WHEN IMPROPER SYSTEM OPERATION IS SUSPECTED.
NOTE:
Ensure boom is fully retracted, lowered, and centered between 
drive wheels prior to beginning lockout cylinder test.
1.
Place a 6 inches (15.2 cm) high block with ascension ramp 
in front of left front wheel.
2.
From platform control station, start engine
3.
Place DRIVE control lever to FORWARD position and care-
fully drive machine up ascension ramp until left front wheel 
is on top of block.
4.
Carefully activate SWING control lever and position boom 
over right side of machine.
5.
With boom over right side of machine, place DRIVE control 
lever to REVERSE and drive machine off of block and ramp.
6.
Have an assistant check to see that left front or right rear 
wheel remains elevated in position off of ground.
7.
Carefully activate SWING control lever and return boom to 
stowed position (centered between drive wheels). When 
boom reaches center, stowed position, lockout cylinders 
should release and allow wheel to rest on ground, it may be 
necessary activate DRIVE to release cylinders.
8.
Place the 6 inches (15.2 cm) high block with ascension ramp 
in front of right front wheel.
9.
Place DRIVE control lever to FORWARD and carefully drive 
machine up ascension ramp until right front wheel is on top 
of block.