3 walk-around inspection, General, 3 walk-around inspection -5 – JLG 19BD Operator Manual User Manual
Page 23: General -5

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121153
– JLG Lift –
2-5
2.3 WALK-AROUND INSPECTION
General
Begin the Walk-Around Inspection at item 1 below. Continue
around machine checking each item in this check list.
CAUTION
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF DUR-
ING WALK-AROUND INSPECTION.
INSPECTION NOTE: On each item, make sure there are no loose
or missing parts, that they are securely fastened and that
no visible damage exists in addition to any other criteria
mentioned.
1. Base Frame - Properly secured to work surface. See
Inspection Note.
2. Manual Descent Control Valve - No evidence of
hydraulic leaks.
3. Motor/Pump/Reservoir Power Unit - No evidence of
hydraulic leaks. Check that hydraulic reservoir fluid level
is filled to the "Fill to Line" mark on the side of the reser-
voir.
4. Ground Controls - Key switch operable; emergency
stop switch properly set for operation.
5. Mast Assembly - Inspect mast chains and sequence
cables as per inspection note. Control and power cables
properly tensioned and seated in control cable sheaves;
control cable sheaves rotate freely.
6. AC Voltage Junction Box - Secure to support, access
door secure and closed.
7. Platform Controls - Inspect UP/DOWN and Function
Enable buttons as per inspection note. Emergency Stop
switch functions properly. Operation & Safety Manual in
manual storage box.
8. Platform Control Foot Switches (optional) - Inspect
UP and DOWN foot pedals. Ensure foot switch enclo-
sure is properly secured to the platform floor.
9. Platform Assembly - Secure to mast; Properly secured
to mounting brackets; entry gate(s) closing properly.
10. Hourmeter - Hourmeter secure and legible.