Preventive maintenance & inspection schedule -3 – JLG 19AMI Service Manual User Manual
Page 17
SECTION 2 - SERVICE PROCEDURES
3121190
– JLG Lift –
2-3
Table 2-2. Preventive Maintenance & Inspection Schedule.
AREA ON MACHINE
INTERVAL
PRE-START (1)
INSPECTION
3 MONTH
PREVENTATIVE
MAINTENANCE
6 MONTH
PREVENTATIVE
MAINTENANCE
PRE-DELIVERY (2)
OR FREQUENT (3)
INSPECTION
ANNUAL (4)
(YEARLY)
INSPECTION
MAST ASSEMBLY
7
Mast Sections
2, 5
2, 5
Chain Systems
14
3, 14
14, 25
Sequence Cable Systems
3
1, 2, 3
Covers or Shields
1
Sheave Systems
1, 2
1, 2
Bearings
1, 2
Slide Pads
1, 2
PLATFORM ASSEMBLY
7
Platform and Material Tray
1
1
Guard Rails
1, 2, 4
1, 2, 4
Gate
1, 5
1, 5
Floor
1, 2
1, 2
Lanyard Anchorage Point
1, 4
1, 4
CHASSIS ASSEMBLY
7
Front Caster Wheels
1, 2
14
1, 2
1, 2
Rear Wheel Assembly
2
2
Bubble Level
1, 7
1, 7
Floor Stop Assembly(s)
1, 3, 7
FUNCTIONS/CONTROLS
7
Platform Controls
5, 6, 7
5, 6, 7
Ground Controls
5, 6
5, 6, 14
Function Control Locks, Guards, or Detents
5
5
Function Enable System
Emergency Stop Switches (Ground & Platform)
5
Function Limit or Cutout Switch Systems
5
Manual Descent or Auxiliary Power
5
5
POWER SYSTEM
Battery
19
9
18
Battery Charger
5
HYDRAULIC/ELECTRIC SYSTEM
9
Hydraulic Pump
1, 2, 9
1, 2, 5, 9
Hydraulic Cylinder
2, 7, 9
2, 9
Cylinder Attachment Pins and Pin Retainers
1, 2
1, 2
Hydraulic Hoses, Lines, and Fittings
1, 9
1, 9
Hydraulic Reservoir, Cap, and Breather
5, 7
5, 7
Hydraulic Filter
Hydraulic Fluid *
11
11
11
Electrical Connections
20
20
Instruments, Gauges, Switches, Lights, Horn
5