Shutdown procedure, Shutdown procedure -3 – JLG 510AJ Operator Manual User Manual
Page 57

SECTION 4 - MACHINE OPERATION
3121179
– JLG Lift –
4-3
2. After engine has had sufficient time to warm up, shut
engine off.
3. Turn SELECT switch to PLATFORM.
4. From Platform, pull POWER/EMERGENCY STOP switch
out, then push the ENGINE START switch until engine
starts.
NOTE:
Footswitch must be in released (up) position before
starter will operate. If starter operates with footswitch in
the depressed position, DO NOT OPERATE MACHINE.
Shutdown Procedure
IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED SHUT-
DOWN, DETERMINE THE CAUSE AND CORRECT IT BEFORE RESTART-
ING THE ENGINE.
1. Remove all load and allow engine to operate at low
speed for 3-5 minutes; this allows further reduction of
internal engine temperature.
2. Push POWER/EMERGENCY STOP switch in.
3. Turn MASTER switch to Off.
Refer to Engine Manufacturer’s manual for detailed informa-
tion.