5 emergency operation, Use of ground controls, 5 emergency operation -3 – JLG 800A_AJ Operator Manual User Manual
Page 107: Use of ground controls -3
SECTION 5 - EMERGENCY PROCEDURES
3121209
– JLG Lift –
5-3
5. Position AUXILIARY POWER switch to ON and hold.
6. Release AUXILIARY POWER switch, selected control
switch, lever or controller, and footswitch.
7. Position POWER/EMERGENCY STOP switch to OFF.
To activate auxiliary power from the ground control sta-
tion:
1. Position PLATFORM/GROUND SELECT KEY SWITCH to
GROUND.
2. Position POWER/EMERGENCY STOP switch to ON.
3. Operate appropriate control switch or controller for
desired function and hold.
4. Position AUXILIARY POWER switch to ON and hold.
5. Release AUXILIARY POWER switch followed by the
selected control switch or controller.
6. Position POWER/EMERGENCY STOP switch to OFF.
5.5
EMERGENCY OPERATION
Use of Ground Controls
KNOW HOW TO USE THE GROUND CONTROLS IN AN
EMERGENCY SITUATION.
Ground personnel must be thoroughly familiar with the
machine operating characteristics and the ground control
functions. Training should include operation of the machine,
review and understanding of this section and hands-on oper-
ation of the controls in simulated emergencies.