13 lifting and tie down, Lifting, Tie down – JLG 1100SJP Operator Manual User Manual
Page 69: 13 lifting and tie down -15, Lifting -15 tie down -15

SECTION 4 - MACHINE OPERATION
3121255
– JLG Lift –
4-15
4.13 LIFTING AND TIE DOWN
See Figure 4-6. and Figure 4-7.
Lifting
1. Refer to the serial number plate, the General Specifica-
tions & Operator Maintenance section of this manual, or
weigh the individual unit to find out the Gross Vehicle
Weight.
2. Place the boom in the stowed position with the turntable
locked.
3. Remove all loose items from the machine.
4. Attach lifting device and equipment only to the desig-
nated lifting points.
5. Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
Tie Down
WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.
NOTE:
When loading the machine onto a trailer, it will be neces-
sary to rotate the turntable 180 degrees to provide better
weight distribution.
1. Place the boom in the stowed position with the turntable
locked.
2. Remove all loose items from the machine.
3. Secure the chassis and the platform using straps or
chains of adequate strength and attached to the desig-
nated tie down points.